St. Mary’s Hospital

Client Name: Imperial College Healthcare NHS Trust

Client’s Business: St Mary’s Hospital is the major acute hospital for north-west London as well as a Maternity Centre with consultant and midwife-led services. The hospital provides care across a wide range of specialties and runs one of four major Trauma Centre’s in London in addition to its 24/7 A&E department.

Location: St. Mary’s Hospital, QEQM Building – Paddington, London

MPE Role: Principal Contractor

Value: £550,000.00

Brief Scope of Works: Enabling works – Forming holes for new cabling and support system and fire stop, Cable route work and forming of brick bund to new LV Switchroom.

Builders work – Supplying and installing new Cage and Access Doors to create new LV Switchroom.

Switchboard Modifications – SS5 LV Switchboard (QEQM Basement), Supply, deliver and install with 800A ACB and ML 5.0E Tripping Unit. Boiler House LV Switchboard (QEQM Basement), Supply, deliver and install new 630A MCCB complete with ML 5.0E tripping unit

New Panel Boards – Non-Essential Panel Board (QEQM Basement), Supply and install new Schneider 800A Panel Board (top entry). Essential Panel Board (QEQM Basement), Supply and install new Schneider 800A Panel Board (top entry). GUN & PICU MCCB Panel Boards – 5 No.

ASCO Switches – Automatic Closed Transition Transfer Switch with Bypass-Isolation Facility – 4 No. Mains cabling and terminating, signal and control cabling, DC cabling, Earthing Systems, system Commissioning, preparation of Operations & Maintenance Manuals (O&Ms) and Safety File documentation.